Telescopic Load-Bearing Prop

Hybrid Support

A telescopic vertical prop that carries formwork pressure from the slab above down to the slab below, adjusting anywhere between 2.5 m and 5.0 m without swapping components.

Two Models, One Range

Height Adjustment Without a Parts Change

Where a fixed shoring tower needs the right combination of post lengths for each slab height, a Hybrid Support prop telescopes. MV4 covers 2,500–4,000 mm and MV5 covers 3,500–5,000 mm, so a single item on the delivery note handles a range of soffit heights.

Both are built from SGT550 (STK700) high-strength steel — an outer tube of Ø70.0 mm × 2.3T over an inner tube of Ø60.5 mm × 2.3T.

Request a Quotation → Compare with System Shoring
Hybrid Support props MV5 and MV4 side by side with their telescopic adjustment ranges marked in red, and a magnified view of the adjustable flange that lets ledger connectors be positioned along the prop
MV5 and MV4 adjustment ranges, with the adjustable ledger flange
Engineering Data

Hybrid Support Post

Adjustment Range

ProductMin. LengthMax. LengthUnit Weight
MV53,500 mm5,000 mm22.0 kg
MV42,500 mm4,000 mm19.0 kg

Tube Material

TubeMaterialDiameterThickness
OuterSGT550 (STK700)Ø70.0 mm2.3T
InnerSGT550 (STK700)Ø60.5 mm2.3T

The flange is repositionable along the prop, so ledger connectors go where the layout needs them rather than at fixed welded centres.

Shared Component Range

Ledgers, U-Heads & Primary Beams

Hybrid Support uses the same ledgers, U-head jacks and primary beams as System Shoring, so yards can stock one set of secondary components across both systems.

Ledger range H1-18 through H1-03

Hybrid Support Ledger

H1-18 to H1-03
1.7 – 4.6 kg

U-head jack

U-Head Jack

UH-43 · Ø43, 600 mm · 5.0 kg

Primary beam cross-section, 75 × 125 mm

Primary Beam

75 × 125 × 2.9T
1.0 m to 3.0 m

Hybrid Support Ledger

ProductLengthUnit Weight
H1-181,768 mm4.6 kg
H1-151,463 mm4.0 kg
H1-121,158 mm3.3 kg
H1-09853 mm2.6 kg
H1-06549 mm2.0 kg
H1-03244 mm1.7 kg

Primary Beam

LengthSectionUnit Weight
1.0 m75 × 125 × 2.9T9.0 kg
1.5 m75 × 125 × 2.9T13.4 kg
2.0 m75 × 125 × 2.9T17.7 kg
2.2 m75 × 125 × 2.9T19.1 kg
2.5 m75 × 125 × 2.9T21.7 kg
3.0 m75 × 125 × 2.9T26.5 kg
On Site

Standard Installation Sequence

Six steps, photographed on a full-scale assembly rig.

Step 1 — setting out and raising the vertical props

1 · Vertical Installation

Step 2 — connecting horizontal ledgers between props

2 · Horizontal Installation

Step 3 — laying working platform planks

3 · Plank Installation

Step 4 — fitting the access stair

4 · Stair Installation

Step 5 — installing the upper horizontal members

5 · Horizontal Installation

Step 6 — placing U-heads and primary beams

6 · U-Head & Beam Installation

Project References

Hybrid Support in Service

Hybrid Support props installed in Gwangsan-gu, Gwangju

Gwangsan-gu, Gwangju

Gross floor area 10,800 m²
Installation height 2.5 – 4.0 m

Hybrid Support props installed in Gimpo-si

Gimpo-si, Gyeonggi-do

Gross floor area 45,700 m²
Installation height 2.9 – 5.3 m

Hybrid Support props installed in Sejong-si

Sejong-si

Gross floor area 32,600 m²
Installation height 4.0 – 4.5 m

Hybrid Support props installed in Yangpyeong-gun

Yangpyeong-gun, Gyeonggi-do

Gross floor area 8,548 m²
Installation height 3.1 – 5.0 m